Services / Equipment services

Non-pressure plant piping and fabrication

Piping-related welding and fabrication for plant maintenance teams, limited to suitable non-pressure, non-structural work. HudArc reviews the service, material, and site requirements before accepting a piping request.

Scope of work

A defined scope before the first weld.

“Plant piping” can cover very different systems. We need to know what the assembly carries, whether it operates under pressure, and how it is used. Pressure-rated and structural work are not HudArc capabilities.

  • 01

    Non-pressure pipe assemblies

    Fabrication or repair requests assessed against material, intended service, drawings, and the condition of the existing assembly.

  • 02

    Related metal fabrication

    Guards, enclosures, brackets, and suitable non-structural supports associated with plant equipment.

  • 03

    Maintenance coordination

    Work planning with your site contact around isolation, access, and hot-work requirements. No work on live, pressurized, or unidentified systems.

HudArc pipe joint weld detail
Selected HudArc work · Pipe joint welds · 2025View projects →
Before the visit

Tell us what needs work.

Send drawings or photos, material, dimensions, system contents, operating pressure, and applicable specifications. Include isolation and cleaning requirements, your site contact, and the available maintenance window.

Response
Calls and quotes answered same day
Emergency
Emergency call-outs available — call any time
info@hudarc.com

Common questions

Do you weld pressure-rated process piping?

No. HudArc does not offer pressure-rated piping, pressure vessels, or certified pressure-system work. Requests must be suitable non-pressure, non-structural work.

Can you work on a live system?

No. The proposed assembly must be safely isolated and prepared, with its service and hazards identified before any work is considered.

Why do you need operating pressure and system contents?

Those details establish whether the work is within our scope and what preparation is required. If the request falls outside our capabilities, we will say so before scheduling.

Let’s review your repair.

Request a quote →